Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131
610KW Solar PV Array nears completion at Trafalgar Drystack, Portchester - Solar Voltaics

610KW Solar PV Array nears completion at Trafalgar Drystack, Portchester

Installation of a 610KW solar PV array by Solar Voltaics is nearing completion at Trafalgar Wharf Drystack.

The Drystack is home to over 300 motor boats and Rigid Inflatable Boats (RIBs) between 4m and 13m long. Trafalgar Drystack is the largest boat storage facility in Hampshire and the UK.

The installation will reduce the electrical demand on site by over 200 MWh and feed over 300MWh into the grid each year.

CO2 emissions will be cut by over 200 Tonnes per year.

The scope of work included:-

  • Feasibility surveys of existing electrical infrastructure and roof construction
  • 3D Design of solar array and full electrical design
  • Performance calculations including self-consumption and CO2 savings analysis
  • DNO grid connection application and management
  • Structural Assessments and Approvals
  • Full installation by our own in-house installtion team
  • Commissioning and witness testing by the local DNO 

Equipment installed comprised:-

  • 1507 Trina Solar 405W panels
  • Renusol Metasole+ mounting system
  • 5 X Solis 100 KW 5G Inverters
  • Monitoring via GSM modem to cloud server

 

Construction phase in December 2022

 