Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131
Solar Voltaics Ltd Commercial Offices in Appuldram - Solar PV installation

Commercial Offices – Appuldram

Our customer wanted to add Solar PV panels to three separate prime office buildings on the outskirts of Chichester.  on the outskirts of Chichester.  The aim was to enhance the let-ability and reduce running costs for tenants whilst maintaining or adding to the attractive nature of the setting.  In addition, the system needed to be divided into a total of eight mini-systems, each connected to individual offices within the site and each with their own metering arrangements.

A total of 27.25 kW of all black monocrystalline panels were selected for performance and visual appeal.  Mounting of the panels was onto slate roofs using MCS approved mounting systems.  Samil inverters were used for their high efficiency and wide DC voltage tracking range.

 

 

 

Arrange A Free Survey