Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131
Three 50KW SolarEdge Systems Installed for Childrensalon, Tunbridge Wells - Solar Voltaics

Three 50KW SolarEdge Systems Installed for Childrensalon, Tunbridge Wells

50 KW SolarEdge System at Childrensalon

A third 50 KW SolarEdge  system has been completed at the premises of the hugely successful family run retailer of designer children’s clothes.

The first two 50 KW systems were installed earlier in the year and are part of an ongoing plan to increase the amount of renewable energy used on site.

Implementation of the third system coincided with the purchase of a new unit for the business, which is increasing export sales rapidly.

The operations run 24/7 and the owners are very committed to reducing the reliance on conventional energy sources. It is hoped to expand the systems further and battery storage may be included at a later date to increase the level of self-consumption.

 

Arrange A Free Survey