Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/solar-voltaics/wp-includes/functions.php on line 6131
Solar Voltaics Ltd Town Centre Offices in Dorking

Town Centre Offices – Dorking

Like many busy call centres and administration offices, our client was facing increasingly high energy costs and climate change levies.  The chairman of this Dorking-based insurance company had a strong desire to do all he could to generate as much green energy to support their facility and improve their carbon footprint.

After a detailed survey of the facility and their electricity consumption, the challenge was to maximise the output from the available flat roof areas. This required careful design to minimise the effects of shading from plant room structures.

A shallow pitch K2 low ballast roof mounting system was used to alleviate the need to fix through the roof membrane, allowing easy maintenance of the roof in the future, if required.

Inverter

Samil 3-Phase Inverter

K2 flat roof mounting system

K2 flat roof mounting system

Arrange A Free Survey